Constellation-class (FFG-62) construction schedule and design stability

SASC · SSIC 5216 · Suspense 2026-07-21

Question

Part a.

What is the current status of Constellation-class construction, and what measures reduce design churn and downstream rework on the lead ship?

Intake

ETMS2

ETMS2-1180251

Hearing

S.Hrg. 119-114, Subcommittee on Seapower, 11 Mar 2026

Received

2026-07-07

OPR

N83

OCR

N80

4 · Coordination
Locked · Requires assigned OCR reviewer

N80

CONCUR

Concur — figures align to PB-2027 extract.

Recommended reply
Auto-generated

Drafted from the question, guidance library, and prior answers. Edit before it enters coordination — every save is audited.

Draft
**Response to QFR from Sen. Kestrel — Constellation-class Schedule**

Lead-ship construction is proceeding, with design-stability measures in place to reduce rework and support a more predictable delivery profile.¹ The Navy is holding the design baseline and sequencing production to protect downstream hulls, consistent with guidance to stabilize surface-combatant procurement in support of the industrial base.² Illustrative procurement and advance-procurement lines for FY2027 surface combatants reflect this approach.³
Sources
  • PRIOR_ANSWER [1] g6
  • GUIDANCE [2] g3
  • BUDGET [3] g7
Research & collection
Illustrative

The draft is unlocked once required inputs return from OCR offices. Auto-suggested from question NLP.

N80/Industrial Base

Confirm supplier count for critical sub-assemblies.

Received

Due 2026-07-14

Program office

FY2027 planned procurement rate + rough delta vs. PB.

Requested

Due 2026-07-16

N81/Assessments

Schedule-risk narrative if throughput flat.

Overdue

Due 2026-07-15

Subordinate data call

No downward data calls opened. Use this when Navy equity requires input from a subordinate/supporting command (CNSP, CNAF, NAVSEA PEO Ships, NAVSUP, CNIC, MSC, NAVFAC).

Clearance chain
OCR + conditional gates

Multi-office clearance. Counsel + Security + Comptroller gates trigger conditionally on content.

OCR · CAPT Marchetti · ConcurComptroller · ASN(FM&C) rep · PendingCounsel · OGC rep · not triggeredSecurity · N09N2 rep · not triggered